Service Pricing and Policies
THE BOAT LOCKER WINTERIZE POLICIES AND PROCEDURES
ALL BLOCK PLUGS WILL BE REMOVED FROM ALL I/O ENGINES AND ATTATCHED TO THE STEERING WHEEL IN A TAMPER PROOF PACKAGE.
THESE BOATS MUST BE RETURNED TO THE BOAT LOCKER WITHIN 10 MONTHS OF THE DATE OF WINTERIZE TO HAVE THE BLOCK PLUGS REINSTALLED AND THE ENGINE INSPECTED FOR DAMAGE.
THERE WILL BE A ½ HOUR CHARGE FOR THIS SERVICE.
THE BOAT LOCKER NOR ANY OF ITS EMPLOYEES WILL BE HELD LIABLE FOR ANY DAMAGE TO ANY PERSONAL PROPERTY IF PACKAGING IS TAMPERED WITH OR DAMAGED, OR, IF THE BOAT IS NOT RETURNED WITHIN THE ALLOTED TIME. THE BOAT LOCKER WILL NOT BE HELD RESPONSIBLE FOR ANY PRE EXISTING FREEZE DAMAGE TO ANY PERSONAL PROPERTY .
THE BOAT LOCKER WILL NOT BEGIN DEWINTERIZING BOATS UNTIL AFTER APRIL 1ST.
BOATS MUST BE PICKED UP WITHIN 5 DAYS FROM THE DATE OF NOTIFICATION OF COMPLETION.
A STORAGE FEE OF $15.00/DAY WILL BE ADDED TO ANY BOAT LEFT AFTER 5 DAYS
Spring Tune- Up and summerization rates coming soon....Summerization on Inboards will not be done until April 15th.
Information request
Galen Freeman (615) 791-1780
Copyright © 2007, Galen and Carolyn Freeman dba The
Boat Locker. All rights reserved.
Web design by
SportsOnRockytop
Productions